Odoo Manufacturing for
the Production Floor
Master your production floor with advanced BOM management, work order control, and real-time material tracking. Planning, shop floor, and quality working from the same live data.
- ✓Multi-level bills of material and routings
- ✓Work centre scheduling and capacity planning
- ✓Shop-floor tablets for work order confirmation
- ✓Quality checks and full traceability
Manufacturing Capabilities From Plan to Dispatch
For discrete, process, and make-to-order manufacturers.
BOM & Routing
Multi-level BOMs with operations, work centres, and standard times.
Production Planning
MRP runs that turn demand into purchase and manufacturing orders.
Shop Floor Control
Operators start, pause, and complete work orders on a tablet at the work centre.
Quality Management
Inline and final inspection points with pass, fail, and rework handling.
Maintenance
Preventive and breakdown maintenance scheduled against each machine.
Costing & OEE
Actual versus standard cost, scrap, and equipment effectiveness reporting.
Production Pain Points
The plan on the whiteboard and the reality on the floor rarely match.
Material Shortages
Production stops because a component was never ordered.
No Live Progress
Order status is known only when the supervisor walks the floor.
Unmeasured Scrap
Rejections absorbed into cost without being analysed.
Manual Traceability
Batch genealogy reconstructed from registers during an audit.
Our Manufacturing Rollout
Floor Study
Routings, work centres, and constraints documented on site.
Master Data Build
BOMs, operations, and standard times loaded and validated against past jobs.
Pilot Line
One line runs live on the system before the rest of the plant follows.
Plant Rollout
Remaining lines added with operator training at each work centre.
Planning, floor, and quality on one screen set
Screens from a live Odoo deployment, configured the way we would set them up for your operation.
Bill of Materials
Multi-level BOMs with operations, work centres, and standard times.
Work Order Tablet
Operators start, pause, and complete operations at the work centre.
MRP Planning View
Demand turned into purchase and manufacturing orders with shortage warnings.
What the plant gets
Order progress by work centre
Lot and serial traceability
Scrap, OEE, and actual cost
Shortages caught before the line stops
Frequently asked questions
Explore Related Services
Ready to build the right Odoo strategy?
Get expert guidance to simplify your processes and support your long-term business growth.